A very successful project in which an overarching Master Chart of Accounts was designed and applied across over 200 companies in a large investment group giving significant benefits


Financial Information Systems Conference

By Kerstin Speer CA(SA), Group Financial Manager, Rennies Group Limited and Dr James A Robertson PrEng


SYNOPSIS

The background to the introduction of a Group-wide financial reporting and management information system for Rennies Group Limited (RGL) is outlined in the context of current thinking on the application of Financial Information Systems (FIS). The status of the Rennies Reporting System (RRS) at the time the decision was taken to develop an information architecture and design is summarized.

The desired components of a three year FIS strategy are presented together with the FIS strategy already in place at RGL.

Considerations with regard to the implementation at RGL are given with particular reference to the fact that a clearly defined customer focused business strategy was already in place and that an EVATM programme was underway.

The procedure followed in undertaking the information architecture and design of the Rennies Group consolidation Master Chart of Accounts included extensive involvement of users and management, definition of a generic, structured business information classification scheme and building a framework to support future development. It is noted that provision is made for a future business model to be developed which will support full cascading of the chart of accounts down to the operational business unit level while maintaining the integrity of the consolidation process. Also revenue and cost driver classification was undertaken in a manner that was independent of individual business units and which will support restructuring, acquisitions, mergers and divestments in the final form of the business model.

A conceptual framework for inter-region, branch and subsidiary analysis has also been laid.

The manner in which RGL has integrated existing systems is outlined with particular reference to the upload of the financial intelligence of the software to assist with integration is described. The importance of the information architecture in achieving this objective is highlighted.

The benefits of implementing FIS are outlined and it is noted that certain flagship operations have leveraged the capabilities of the solution by moving their management reporting function onto the new system while it was still in pilot operation. These sites achieved considerable improvement in analysis and reporting capability with a resulting time saving that was used to free financial personnel up to undertake more effective analysis.

A summary of the benefits that RGL has obtained from FIS strategy is provided and it is noted that the current project has laid the foundations for a long term process of progressively improving management information delivery and decision support within the Group in a manner that has the potential to enable the Finance Function to add considerable value to the operating entities.

It is concluded that effective information architecture and design is vital to ensuring a return on investment in FIS and that, if this is correctly undertaken and implemented, it will enable the Finance Function to add considerable value to the organization at all levels.


1.  INTRODUCTION

The concept of Financial Information Systems is well established as a result of many conferences and other development. Robertson has addressed a number of aspects of this subject, most recently at the Financial Management Information Systems Conference, held in Midrand in September 1994 at which a paper entitled, Identifying Your Key Business Objectives to Develop a Coordinated FMIS Strategy that Meets Your Specific Needs was presented. As a result of the presentation to this conference, it was decided to introduce some of the concepts addressed in the presentation into the "Rennies Reporting System" (RRS), which was currently being planned.

RRS is a group-wide consolidation and reporting system using a commercial consolidation product, Hyperion. RRS objective is to consolidate information from the approximately 220 operations in the Rennies Group up to Group Head Office in Johannesburg in a manner that will support Group reporting requirements and support the overall business strategy of the Group. This paper presents some of the concepts applied in the project to date in the form of a case study.

As noted above, the solution was implemented using commercially available software. This was installed on a client-server database platform. The subject of this case study is therefore not the design or selection of a software and technology solution but the information architecture and design of the business solution implemented using the product selected. It is hoped that this paper will serve to draw readers attention away from technology and cause them to focus on the business design issues surrounding the use of Information Technology (I.T.) in general and FIS in particular.


2.  WHAT SHOULD FIS STRATEGY ENTAIL

Robertson, in the paper referred to above, recommends that a three year FMIS strategy should incorporate the following:

a. Determine broad business objectives.

b. Determine what financial information is required in order to give effect to these objectives

c. Determine what financially related business concepts should be introduced or enhanced in order to meet these objectives in support of improved management decision making.

d. Evaluate the fundamental changes to financial operating procedures and systems required to support the objectives including:

i.    First principles analysis of financial systems and coding systems.

ii.  First principles analysis of the business model incorporated into the financial systems to support unambiguous ownership.

iii.  Comprehensive review of up-stream and down-stream controls on the flow of information in the FIS.

iv. Evaluation of implementation considerations with regard to system acceptance.

e. Investigate use of multiple bases of accrual.

f. Develop overlay ledgers for different levels of adjustment, such as EVA.

g. Develop a culture of future focused management applying these concepts to create and sustain competitive advantage in a manner that truly adds value to the organization.

h. Consider the extension of the FIS to become part of a "Corporate Command Center"

This approach to FIS strategy is the vision of the Rennies Group and has the commitment of management. It also has the potential to truly differentiate the organization.


3.  RENNIES GROUP IMPLEMENTATION CONSIDERATIONS

In the case of Rennies Group Limited (RGL), the project was undertaken as an extension of an existing project which was already underway. In particular, RGL had already clearly defined its strategic objectives as a customer focused service organization and had appointed Stern Stewart and Company to implement a comprehensive Economic Value Added (EVATM) program. In addition, the technology platform and software for the RRS had already been selected and a project plan had been drawn up.

The implementation was therefore undertaken on a limited scale with emphasis on first principles analysis of the information classification schemes and coding of the Group Consolidation Ledger to support the great diversity of businesses in the Group. The group ranges from well-known operations such as Rennies Travel, Rent a Bakkie, Renfreight and XPS to less well known trading and freight management businesses such as Manica which operates throughout Southern and Central Africa.

Basic consideration was given to conceptualization of the business model and overlays for management accounting purposes but these will be designed in detail as part of a later phase of the project.

Implementation was undertaken by way of a multiple pilot site deployment in terms of the original project plan under the guidance of Group Information Services.

Accordingly, this paper concentrates on the information architecture and design of a Group Consolidation Chart of Accounts to serve the full diversity of companies within the group.


4.  INFORMATION ARCHITECTURE AND DESIGN OF THE GROUP REPORTING GENERAL LEDGER CHART OF ACCOUNTS

Design was undertaken by way of a series of workshops with senior financial and operational managers of the larger divisions and companies within RGL. During these workshops, the following was achieved:

a. Widespread consultation with senior end users.

b. Development of a clear understanding of the diversity of businesses within the Group with a particular emphasis on determining business unit independent definitions of Revenue Drivers and Cost Drivers in a manner that would enable a generally applicable chart of accounts to be developed which would accommodate any change in organizational structure, including acquisitions, mergers and divestments.

c. Design of a highly structured information classification scheme that supported full hierarchical analysis and drill down within the guidelines given by Robertson (19949 and others).

d.  A design that supported both disbursement and expense orientated operations.

e. A framework to support monthly, year-end, tax, management and EVA reporting requirements, amongst others.

f.  A clear understanding of the business model that should be implemented.

g. Conceptual definition of a framework against which inter-region, inter-branch and inter-subsidiary analysis could be implemented at a later stage. This also provided a conceptual framework for definition of a market sector input : output analysis at the financial level.

h. Definition of a solution that could be "cascaded" through the Group to individual operating companies and eventually to SBU level.

i.  Definition of a solution that would provide the foundation for business modelling and a broad based "Executive Information System" (EIS) at a later date in a manner that would enable Group Finance to add considerable value to individual operating companies in time.

The information architecture and design of the RRS Chart of Accounts was spread over a period of approximately two months with a high level of involvement from the Group Financial Manager, Project Manager, Consultant and other team members throughout this period. Approximately ten workshops of from two to eight hours duration were held with users and management of groups of subsidiaries and individual companies. Further project meetings took place throughout the period. The end result was a consolidation chart of accounts with approximately 700 posting level accounts suitable for implementation across the entire organization at a business unit level.


5.  HOW RENNIES GROUP LIMITED HAS INTEGRATED EXISTING SYSTEMS

Existing general ledger systems were integrated in the following way:

a. Existing general ledger charts of accounts were mapped onto the Hyperion consolidation chart of accounts in paper mapping exercises facilitated by the project team.

b. ASCII upload files were generated from the existing systems in a format that could be uploaded into the Hyperion software.

c. The functionality of Hyperion permitted a direct link between existing systems such as Accpac, Accountability and Millenium through account conversion and name conversion tables.

d. The upload used as building blocks groups of accounts classified into categories including:

i.   Income statement accounts (revenue, disbursement and expense).

ii.  Balance sheet accounts (intangible assets, assets, liabilities).

iii. Reporting accounts such as cash flow and budget.

iv. Balance and control accounts.

v. Non-financial, derived and other information for purposes such as tax, year-end, EVATM, etc.

e. A basic business entity model was implemented in order to provide systematic consolidation into Divisions and from Divisions to Group. This model reflects the organizational structure of the group.

f. Separate input and adjustment entities are defined for use in different stages in the process.

g. Input ledgers are maintained in the currency of origin and foreign currency translation takes place at the appropriate location in the organizational structure.

h. Reporting is performed using the reporting capabilities of the tool used together with dynamic linking to the Microsoft Excel Spreadsheet package.

The project team is currently busy with the deployment of the application to further sites and the extension of the application to more fully support all aspects identified.

Business modelling, market modelling, geographic analysis and the introduction of an EIS are scheduled to take place in the second half of the year.

Effective integration was made possible by the structured financial information classification contained in the Master Chart of Accounts referred to previously. This structure ensures that, while individual subsidiaries may apply different accounting treatments with regard to aspects such as disbursements, the Group consolidation figures are based on a uniform treatment which accommodates the diversity of business operations.

 

6. BENEFITS OF IMPLEMENTING FIS

While the RRS system will only run live from 1 July 1995, it is currently in use for budget purposes for the 1995/96 financial year. It is currently deployed at the Divisional Level as well as at 18 major operations.

Benefits that are anticipated from the RRS include a saving in the production of the Group Tax statements of approximately three weeks at year-end, a saving in producing the year-end pack of approximately two weeks together with a considerable reduction in reconciliation and manual reprocessing effort. A monthly saving of 3 days per month at Group Level in producing consolidated Group Financial Reports is anticipated.

It has been found that all operations have been able to map their existing general ledger accounts onto the consolidation chart of accounts successfully, although individual entities have experienced some difficulty where more detail has been requested than they are accustomed to providing.

More tangible benefits have been experienced at certain pilot sites where enthusiastic and proactive involvement by financial management and the executive of the companies concerned has resulted in the full potential of the system being realised. In one notable case, a subsidiary moved it's management reporting off their existing bureau based general ledger systems onto the new system while still in the pilot stage because of the greatly improved reporting capabilities of the new system.

In this case, the time saving resulting from improved ease and effectiveness of reporting has been beneficially utilized in undertaking more detailed analysis in support of management effectiveness. This is expected to give rise to better decision making with regard to branch viability and competitiveness and an increase in market share is projected as a result.

In another notable case, a one-to-one link between the existing general ledger system and RRS has created a powerful reporting tool which is exploited fully by this operation. Furthermore, by efficiently using the name structure capabilities of the tool, reporting of profit centres by region, product type and executive is simple and flexible and is empowering the user in preparing financial information.

In flagship cases such as the above sites, a major benefit to Group Finance has been an opportunity to be seen by subsidiaries to be adding value to the operations of the Group. This demonstrates the potential synergy of a forward thinking central Group Finance Department anticipating the decision support information needs of subsidiaries.

 

7. WHAT HAS RENNIES GROUP LIMITED GAINED FROM FIS?

The expected benefits of the RRS FIS and those experienced to date are set out in the preceding section.

In addition, Rennies Group has gained a platform on which a wide variety of value adding services can be delivered by Group Finance and financial management of individual operating companies. This business solution platform provides a basis on which:

a. Improved Group reporting can be built.

b. A corporate business model can be implemented.

c.  Group-wide EVATM analysis and reporting can take place.

d. Reporting of Key Performance Indicators (KPI's) including non-financial components can be undertaken.

e. Regional and market based analysis can be designed and implemented

f. Improved reporting effectiveness at the operational level and improved management decision support.

Significant further analysis and design of the business model and other components referred to above will be required before these can be implemented. Much of this is planned for the second half of 1995.


8. CONCLUSION

The background concepts and business environment surrounding the Rennies Reporting System have been outlined together with major considerations taken into account in the information architecture and design of the system. Particular emphasis is placed on the importance of effective information classification and the approach adopted in developing a Group-wide Master Chart of Accounts is set out in some detail.

Principal strategic considerations and factors to be taken into account in planning the FIS project have been summarized.

Certain initial benefits experienced by Rennies Group Limited, including dramatic improvement in financial management reporting capability of flagship sites are outlined. Other expected benefits are summarized. Opportunities to develop market focused analysis and reporting capabilities are identified as a particularly important component of future opportunities.

It is concluded that effective information architecture and design of an FIS can give rise to significant benefits and are vital if the Finance Function is to be seen as adding value to the organization.


ACKNOWLEDGMENTS

The support of the management of Rennies Group Limited and their permission to publish this paper is gratefully acknowledged as is the contribution of all members of the project team.

The contribution of dS2's clients, associates and staff, without whom it would not have been possible to evolve and develop these concepts is gratefully acknowledged.

 

FOOTNOTE

Rennies Group Limited is an investment and management company in a multi-business netork focusing on freight management, travel and other related services. The Group provides resource backing to autonomous operating companies operating in Southern Africa through ownership and internationally through alliances.

Rennies Group Limited is jointly controlled by two major South African corporations, namely Safmarine and Rennies Holdings Limited and Anglo American Industrial Corportion Limited.

The Rennies Group has operated in Southern Africa for 146 years and is a regional force in the transport services industry. Employing some 10,200 people, Rennies offers in excess of 30 different services through more than 350 locations in eight countries in Southern and Central Africa.

The Group's current strength and future strategy linges on three crucial factors:

- A single-minded focus on managing the movement of people & freight.

- The depth of its skills.

- The breadth of its network.


Differentiated Strategic Solutions (Pty) Ltd is a firm of independent business information system specialists, management consultants and software developers. They are able to provide the full range of professional services necessary to architect, design and implement financial information systems and to integrate existing systems including all aspects outlined in this paper.

Particular emphasis is placed on aspects of design and implementation necessary to improve business process and maximize information return on investment. Products and services include the information and systems architecture, design and implementation of financial information systems from a fundamental first principles basis, the conceptualization, specification, construction and implementation of integrated information systems, enterprise information systems (EIS), corporate command centres and other business information systems.

They also offer a range of services with regard to strategically focused financial management information determination and linking financial planning to business strategic and macroeconomics in terms of the capability of the balance sheet and economy to sustain strategic objectives. System audits, development of IT strategies and business system feasibility analysis are other services.

Together with associates in The MaXus Group and other associated specialists they are able to provide a wide range of additional consulting and other services in support of the concepts outlined in this paper extending to comprehensive Business Process Optimization services applying techniques developed through an international network of expertise. dS2 can be contacted on Johannesburg 886-9863 or fax 787-0132.


REFERENCES

Robertson, J A (1994) Identifying Your Key Business Objectives to Develop a Coordinated FMIS Strategy that Meets Your Specific Needs Presented at Financial Management Information Systems Conference, Midrand, September 1994.

Download the Information Architecture and Design of FIS for Rennies Group -- Article in Adobe pdf format




026 Information Architecture and Design of FIS -- Rennies Group Limited Case Study -- by Dr James A Robertson PrEng from James Robertson


Download Information Architecture and Design of FIS -- Rennies Group Limited Case Study -- Slides in Adobe pdf format

Download Information Architecture and Design of FIS -- Rennies Group Limited Case Study -- Original Paper in Adobe pdf format


print
[MAKERATING] The comment feature is locked by administrator.
Sort by:
Return


Random Selection of Articles by Dr James Robertson

SNw 043 Strategically Enriching your BIS: Part 1 -- Introduction

Introduction to the principles of precision configuration and strategically enriching your business information systems
Std 003 Example General Ledger Manual

A redacted version of an actual manual for a JARandA Chart of Accounts for a small manufacturing company.  This manual gives a comprehensive picture of how the Chart of Accounts is structured, how the Cubic Business Model works and the reporting and other opportunities that the design provides

Subscribe to our StratNews newsletter

Click here to send us an email subscribing to our free newsletter -- all articles posted by James Robertson will be emailed to you

Dr James A Robertson PrEng The ERP Doctor

Business Systems NOT delivering?

Call the Business Systems Specialist

Dr. James Robinson

Dr James A Robertson -- has been involved in the effective application of Business Information Systems, including but NOT limited to ERP, since 1987 and in the profitable and effective use of computers in Business since 1981.

Drawing on a diversity of experience, including formal military training in Quick Attack techniques at the Regimental Commander level, Dr Robertson has developed highly effective methods of investigating any sub-optimal Business Information Systems situation -- be it an established system or a stalled project or any other source of Executive frustration -- quickly and concisely diagnosing the root cause of the problem and prescribing concise practical actions that Business Executives can effectively act on see the Pulse Measurement page and also the Sample Reports page for redacted real reports.

He has also developed highly effective methods of strategically enriching systems to unlock the full potential of existing investments, see the Precision Configuration page and couples this to architecting small pieces of clever software that harness the full potential of your investment, see the Software page.

If you are having problems with your systems, your project or your IT Department, call The Business Systems Specialist
James@James-A-Robertson-and-Associates.com

Business System Failure is RIFE -- we offer insight into why this happens AND WHAT is required to prevent it.

Failure is at epidemic levels with massive damage done to client companies -- if you are NOT aware of the extent of the problem please visit the About Failure page for a catalog of major failures running to billions of Pounds and Dollars.

All evidence indicates that the established players do NOT know how to deliver stable, reliable high value solutions that WORK.

There HAS to be a better way!

This website provides information relating to that way with a large collection of white papers, presentations, standards documents, etc that you can use to start bringing the situation under control

We also offer high level advisory services with regard to the application of the principles advocated on this website

We offer an ENGINEERING APPROACH to addressing these issues

Click here to read more about the Engineering Approach

By Engineering I mean the formal, structured, highly disciplined, highly systematic, highly practical approach that consistently delivers results in ALL areas of human endeavor where formally trained and certified engineers are the ONLY practitioners permitted to operate -- think large buildings, factories, motor vehicles, aircraft -- highly complex systems that work at a level that we take it for granted that they WILL work and where failure is all but unthinkable and, when it happens, attracts immediate public attention and rigorous investigation directed at ensuring that such failures are prevented in the future -- in fact, everything that the management consulting industry that implements complex software systems is NOT

This approach is discussed further on the Engineering Approach page.

Book -- The Critical Factors for Information Technology Investment Success

In 2003 I undertook an in-depth analysis of all the information and experience that I had gathered with regard to the factors giving rise to Business Information System failure including ERP and general IT and classified this information into a number of categories including "The Factors Causing Failure" and "The Critical Factors for Success" based on this I developed a two day Course "The Critical Factors for Information Technology Investment Success" which is still offered today.

Based on this I wrote the book of the same name, which is available in electronic form here for download:

Connect with James Robertson on LinkedIn

James has a very detailed profile on LinkedIn should you require further information about him.

You can also connect with him on LinkedIn at http://www.linkedin.com/in/DrJamesARobertsonERPDoctor

James has an open networking profile -- click on "Connect" and use email address James@LinkedIn-at-JARA.com.

Contact Us

You can contact us on

Email: James@James-A-Robertson-and-Associates.com

LinkedIn at http://www.linkedin.com/in/drjamesarobertsonerpdoctor

Facebook at https://www.facebook.com/james.a.robertson.393

Mobile: +44 (0) 776-862-2875

Landline: +44 (0) 207-059-0007

Fax: +44 (0) 844 774 4580

Articles by James A Robertson and Associates

There is a large body of white papers, articles and other content produced by Dr James Robertson available on this website

Please click here to visit the detailed listing of articles


Random Selection of Articles by Dr James Robertson

Std 003 Example General Ledger Manual

A redacted version of an actual manual for a JARandA Chart of Accounts for a small manufacturing company.  This manual gives a comprehensive picture of how the Chart of Accounts is structured, how the Cubic Business Model works and the reporting and other opportunities that the design provides

SNw 039 Strategic Essence: The Missing Link: Overview

Overview of the main points of the series of articles on strategic essence, strategic essence being "the essence of the organization and how it thrives" and focused on the "right things" for the organization to do and then on doing those things "right" in accordance of the definition given by Professor Malcolm MacDonald
Std 023 Procurement: 01 Large Project -- Request for Proposal for Turnkey Solution

This is the RFP for larger projects referred to above, the document is too long to include on this webpage but is attached below

ArticleTagCloud for Articles Published by James A Robertson and Associates

7 steps to FIX your ERP      80:20 regarding software replacement      aborted projects      abstract      abstractness      accounting      actionable      adjudication      Advantage Data Transformer      advisory      agreement      all possible classifications      all reports      all software elements required      all spreadsheets      all tasks required to execute the project      Alpha Omega      analysis of data      analytics      animation      answers to the questions we have NOT yet thought to ask      Armscor      arrogant ignorance      art of strategic business information system project leadership      ASCO      attendance register      attorney      audit      audit cost reduction      bankrupt organizations      basis for achieving alignment      basis of payment      basis of pricing      better way      bid adjudication      bid adjudication score sheet      bid compliance      bid compliance checklist      bill of materials      bill of services      BIS      BIS failure      BIS success      boots in the mud      BPM      BPM dangerous      BPM distracting      BPM ineffective      brainstorming      break it until it does NOT break anymore      break it until it will NOT break any more      budget      budgeting      business engagement      business executives      business improvement      business information system      business information system failure      business information system success      business information system taxonomies      business information systems      business information systems procurement      business information systems projects      business integration      business intelligence      business intelligence models      business knowledge and experience      business participation      business process      business process mapping      business requirements focused      business requirements specification      business simulation laboratory      business systems      business systems laboratory      business understanding      by the book      care      case studies      case study      CEO      CEO -- project leader communication      CEO as custodian      CEO definite views      certificates      challenges      challenging presentations      change facilitation      change for strategic reasons      chart of accounts      classification schemes      clever software      client changing scope      client compact      clinical codes      coaching      Cobol      COBOL CAN be retained      Cobol still viable      code schemes      coding conventions and standards      cognitive span      collapse      communication      competitive advantage      competitive advantage through precision configuration      competitiveness      compiler      complexity      compliance      compliance checklist      comprehensive testing      Compuware      conference speaking      conferences      confidentiality      configuration      consultant NOT delivering what required      contract      contract certificates      contract law      contracting      contractors      corporate planning      cost      cost-quality-time      CPT 4      CPT4      critical factors      critical factors for IT investment success      critical factors for success      critical factors for technology success      critical human foundation      critical issues      critical issues analysis      critical requirements      CRM Risk Control      cubic business model      custom development      custom software      customer focused      data      data content      data engineering      data entities      data warehouse      DB2      definitions      design against failure      design and development      design for success      determination of strategic essence      determining strategy      diagnostic code      diamonds in the dust      differentiated      differentiation      diffusion of innovations      discovery      dislike of failure      dispute resolution      do NOT change systems because of alleged software redundancy      do things competitors could NOT do      document pack      Dr James A Robertson      Dr James A Robertson PrEng      dramatic benefits      dramatically improved strategic management information      driver of success      Dunning-Kruger effect      ease of use      economic collapse      economics      effective communication      effectiveness      efficiencies      efficiency      efficient filing of emails      eliminate light bidders      email      engineer against failure      engineered data      engineering      engineering approach      engineering approach to strategy      engineering failure      engineering laboratory      engineering services      engineering solution design      engineering techniques      enhance differentiators      enhance the differentiators      enhancing the value of your present investment      ensuring project success      enterprise resource planning      ERP      ERP configuration      ERP failure      ERP procurement      ERP success      ERP taxonomies      ERP value      essence IS different      essence of business      essence of the business and how it thrives      ethics      examples      exceptionally bad code design      executive briefing      executive briefings      executive custody      executive decision support      executive engagement      executive forum      executive frustration      expose hidden agendas      facilitation      factors causing failure      factors causing IT investment failure      factors causing technology failure      factors to manage for success      failure      failure to address soft issues      fashion      file table of contents      Financial Information System      financial information systems      financial management      fixing your ERP      focus for projects      folder design      foundation for delivery      full training      functional entities      future      Gantt Chart      gap analysis      general ledger      George Paton      go-live      go-live certificate      governance      governance = care      governance failure      group consolidation      Group Consolidation Chart of Accounts      growth      gut feel factors      hand holding      harshest judge of governance      hate failure      head count reduction      health management software      hierarchies      high level requirements      high road      high value      high value implementations      high value solutions      high value systems implementation      highly effective chart of accounts      holistic view of solution      how do you achieve executive custody      how the organization differentiates itself      how to      how to do it      huge opportunity      human foundation      hype      Hyperion      IBIS      ICD 10      ICD10      importance of executive custody      improved management information      in-box rules      incremental enhancement of existing systems      ineffectiveness      inefficiency      information required from third party suppliers      information technology      information technology failure      Information Technology Strategy      information technology success      Informix      in-house courses      innovative software solutions      innovator      inside head of CEO      insightful      instructions      intangible      integrated business information system      integrated view of business      integrity      intelligent data      interactive training material      interview      invitation to bid      isolated CEO = explosion      IT      IT and strategy      IT Audit      IT failure      IT governance      IT lies      IT management      IT mythology      IT non-performance      IT people who lie      IT personnel socialization      IT procurement      IT projects that fail      IT strategy      IT systems      IT systems procurement      IT the harshest judge of governance      James Robertson      Jof Nelson      key performance indicators      Kirsten Speer      knowledge management      laboratory      lack of an engineering approach      lack of precision configuration      lack of strategic alignment      lawyer      leadership      legal agreement      legislation      lies      list of required software      listen carefully      litigation      logical entities      loss information      low road      loyalty      MacDonald      maintain code schemes      maintenance      maintenance management      Malcolm McDonald      management      management information      managing contractors      manual      marketing hype      master data      master data classifications      master test data      mature facilitation      mature facilitator      measurable      measures of alignment      mentoring      Microsoft Outlook      misrepresentation      missing link      mistique      morals      Munich      mystique      mythology      new future state      New South Africa      no drill down      non-disclosure      NOT classic project management      obsolete is a fashion statement      obsolete software      old software IS viable      once software works it always works      on-line seminars      opportunities      opportunity to turn the economy around      organizing Microsoft Outlook      orientation of IT staff      own business experience      passion to enable clients to thrive      people are part of the system      personality matrix      planning      platform for a tough contract      precisio      precision      precision configuration      precision configuration advisory      precision configuration leadership      precision data      precision taxonomies      Predictive Index      preparatory steps      prescribed table of contents      presentation technique      presentations      preventing failure      preventing falure      preventing project failure      pricing      principles      problem statement      procedure code      process      processor ignorant of language      procurement      procurement timeline      professional speaker      Professional Speakers Association of Southern Africa      profitability      programming languages are for the programmer      project facilitation      project leader      project leader -- CEO communication      project leadership      project management      project management IT project management      projects      prove it works      PSASA      psychology      psychometrics      public conferences      public presentations      public speaking      Pulse Measurement      quality      REAL issues in Business Information Systems      REAL value      recognizing failure      redaction      reduced audit costs      reduced head count      reference documents      Reg Barry      regulatory body      relationship Almighty      relationship orientated      remediation of existing systems      Rennies Group      reports      reports not reliable      request for proposal      requirements specification      results orientated      RFP      right things      rigorous process      rigorous strategic planning      risk management      Robert Priebatsch      robust business information systems procurement      robust business systems procurement      robust contracts      robust procurement      robust solutions      SAICE      SAP ABAP is similar to COBOL      scheduling procurement      scientific professional      score sheet      screen design      seminars      SEPT      service orientated      Service Orientated Architecture      simple techniques to enhance business information systems value      simulation      sloppy configuration      SOA      socialization      software      software assets      software design      software does NOT wear out      software is instructions for the bricklayer      software schedule      software specification      software specification standards      solution experience      solution knowledge      South Africa      South African Institution of Civil Engineering      speaking      Spirit Led      standards      strategic      strategic advisory      strategic alignment      strategic analysis      strategic analysis and design      strategic business improvement      strategic custom development      strategic definition      strategic discovery      strategic driver      strategic driving force      strategic engineered precision configuration      strategic engineered precision taxonomies      strategic essence      strategic financial information      strategic gap analysis      strategic governance      strategic information      strategic management      strategic management information      strategic plan      strategic planning      strategic project leader      strategic snapshots      strategic software      strategic solution architect advisory      strategic solution architect leadership      strategic solution architecture      strategically designed chart of accounts      strategy      strategy defined      strategy focused planning      Strategy Snapshot Toolset      StratGap      StratSnap      strengthen differentiators      structured analysis      structured chart of accounts      substantial management information      succeed by engineering against failure      success      successful deployment      survive      system knowledge and experience      table of contents      tailored presentations      take notes      taxonomies      taxonomy      taxonomy software      technology      technology failure      technology issues      technology management      tender document pack      tender pack      tender pack table of contents      test data      testing      The Critical Factors for Information Technology Investment Success      the Critical Factors for Success      the essence of the business      the essence of the business and how it thrives      the essence of the organization and how it thrives      the factors causing failure      the first hour      The REAL Issues in Business Information System success      things right      third party suppliers      third world countries      thrive      time      tipping point      tough certificates      tough contract management      tough contracts      tough procurement      tough terms      training      training material      treatment code      understanding of data      understanding the engineering approach      Uniface      unlocking value      use different languages for new components      V3 Consulting Engineers      validation data      value      versus process      video      webinar      webinars      weighted factors      what is executive custody      what is strategy      what is the essence of this organization and how does it thrive      what to do      where is IT going      why executive custody is required      why the organization exists and how it thrives      why your business information system is NOT delivering and HOW to FIX it      why your ERP is NOT delivering and how to fix it      workflow      writer     

Search Articles

Table of Contents

Home

About Dr James A Robertson PrEng -- The Business Systems Doctor -- and Other Topics

Catalogue of Major Business Information System Failures

About the Engineering Approach

James Robertson's Value Add

Attributes of a HIGH VALUE solution

Recognizing Business System Failure

The Critical Human Foundation

Old Software IS Viable

From South Africa

Competencies of Dr James A Robertson PrEng

About Professor Malcolm McDonald

Table of Contents

About my relationship with the Almighty Creator, Yah the Eternally Self-Existing

Comments relating to the Business Systems Industry and other topics

Testimonials and other positive material regarding James Robertson

Reference Articles

List of Articles

Article Catalogue

Achieving High Value Business Information System outcomes

Executive Custody -- What is it and HOW do you get it?

The REAL Issues in Integrated Business Information System Success

Part 1: Introduction

Part 2 -- Mythology and Lack of Executive Custody

Part 3 – Strategic Alignment and Precision Configuration

Why your ERP is NOT delivering and HOW to FIX it

IT Project Management

Pulse Measurement

CEO Anthony Lee Comments on his experience of the Pulse Measurement

No Charge Guarantee on the Pulse Measurement Service

Examples of Pulse Measurement Outcomes

Critical questions regarding the Pulse Measurement™

The Pulse Measurement Workflow

The Critical Factors for Business System (ERP+) Investment Success in the Pulse Measurement

Indicative Pulse Measurement Durations

What is a JAR&A Pulse Measurement?

Survival of the fittest – why it makes sense to measure the pulse of your business

Examples of Pulse Measurement Outcomes over 24 years

Sample Pulse Measurement Reports

Strategy

Strategic Essence: The Missing Link in Business Information Systems

Strategic Essence: Overview

Strategic Essence: Part 1 -- Strategy Defined

Strategic Essence: Part 2 -- Differentiation

Strategic Essence: Part 3 -- The Essence IS Different

Strategic Essence: Part 4 -- The Essence should be the Point of Departure

Strategic Essence: Part 5 -- Discovering Strategic Essence

Strategy -- the Essence of the Business: What is it and how do you develop actionable strategic plans?

Simple Steps to Increase the Strategic Value of your ERP Investment

Free Strategic Snapshot Toolset and Manual

A strategy focused planning system beyond traditional budgeting

Tough IT and ERP Procurement and Contracting that Works

Robust Business Systems Procurement

Part 1 -- Introduction

Part 2 -- Bill of Services, Laboratory, Go-live Certificate, etc

Part 3 -- Executive Engagement, Bid Compliance, Adjudication and other matters

Procurement Documents

Guidance and Advisory Services

The Art of Project Leadership

Why Regular Communication with the CEO is Vital

The Business Simulation Laboratory

Precision Configuration and Strategic Business Information Architecture

Precision Configuration based on Strategic Engineered Precision Taxonomies

The JAR&A Cubic Business Model

Highly Structured Strategic Chart of Accounts -- a Vital Element of your Corporate Information Arsenal

The Product Catalogue -- an Essential Element of any Precision Configuration

Attributes -- answers to the questions you have NOT yet thought to ask

Case Studies of Notably Successful Projects with high value Precision Configuration

092 Doing things differently and better -- ASCO Case Study 2-- BPM Summit 2013

088 Strategic ERP Invesment -- ASCO Case Study -- Service Management Conference and Exhibition Africa

026 Information Architecture and Design of FIS for Rennies Group -- Financial Information Systems Conf

018 CRM Risk Control: Designing and Implementing an Integrated Risk Mgmt Sys -- Integrated Risk Mgmt Conf

011 V3 Consulting Eng: Benefits of MIS to Professional Practice -- SAICE 15th Ann Conf on Computers in Civil Eng

Strategically Enriching your Business Information Systems

Part 1 -- Introduction

Part 2 -- Principles of Data Engineering

Part 3 -- Steps in applying these recommendations

Simple Steps to increase the strategic information value yield from your Business Systems Investment

The Full JAR&A Taxonomy Manual

Part 1: Introduction, Problem Statement, Definitions and Examples

Part 2: Why Use JAR&A, Required Knowledge and Experience, Cubic Business Model and Chart of Accounts and Taxonomy Software

Part 3: How to do it, Case Studies and White Papers and other References

Example General Ledger Manual

Business Process -- Irrelevant, Distracting and Dangerous

The RIGHT Approach

Custom Strategic Software Design and Oversight of Construction

Standards for Custom Software Specification

What IS Software?

IT Effectiveness

Organizing Outlook

Critical Factors for I.T. Success

A Moral and Ethical Dilemma -- Systems that Fail

Case Studies examining Business Information System failures

The BBC Digital Media Initiative Debacle

The Bridgestone -- IBM Conflict

Speaking and Training

Showcase of Conference Presentations

Most Viewed Presentations

Briefings and Seminars

Why your ERP/BIS is NOT delivering and HOW to FIX it

ERP and IT Procurement that Delivers Results

The Critical Factors for IT and ERP Investment Success

Other Seminars

Conferences and Public Presentations

Conferences 80 to 99 -- 2009 to Present

Conferences 60 to 79 -- 2005 to 2009

Conferences 40 to 59 -- 1996 to 2005

Conferences 20 to 39 -- 1994 to 1996

Conferences 01 to 19 -- 1989 to 1994

On-Line Seminars (Webinars)

Webinar on Preparing and Presenting Webinars

Contacting James A Robertson and Associates Limited